My brother Bernie came over to help as he so often does on Saturdays. We installed the pitot pressure line in the left wing, riveted the remaining right wing lower skins that had not been accomplished on our last riveting session, riveted the left wing lower skins, ran the wiring conduit through the left wing structure and riveted all inspection panel nut plates on. It was a very productive day.